Electrical Application Details for App #: M220729
Premises: 73 8 AVENUE MANHATTAN BIN: 1011708     Block: 629   Lot: 38
   
Application Completed and Certified

Filed: 73 8 AV Census Tract:   77 Health Area:  6100
1ST FLR Admin Area:   M - MANHATTAN Inspection Area:   R
NEW YORK, NY 10014 Community Board:   102
DOB Cross Street(s):   GREENWICH AVENUE,    WEST 14 STREET
Status:   C - JOB IS SIGNED OFF 10/29/2003
Request Type:   P - PICK-UP eFiled:   NO
Application Entered:   08/25/2003 Job Start Date:   08/15/2003
Last Change:   10/29/2003 Job End Date:   01/15/2004
Appointment Status:   
Last Inspection By:   REDDINGTON, J.       On     09/17/2003      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 009615 Licensee Name: ROBERT COVELLO
Firm: 001205 Firm Name: ROBERT S. COVELLO
Firm Phone: 718-786-7390  Firm Address: 51-20 35TH STREET L.I.C. NY 11101 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
9 - OTHER
Total Fee:  $61.25
Other Work:   VIOLATION REMOVAL
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   K - Store
Store / Other:   CLUB GO
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: KOS 73RD 8TH AVE CORP
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 39  14    39                
Total Units : 95 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  02/19/2003
Power Issued: Response: F - FILED TO REMOVE OBJECTION 08/25/2003

Follow-Up: X - FILED APPL,NOW CLOSED 08/25/2003
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M220729
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 02/12/2003 02/19/2003 SVJ W (5) (2)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(2) 09/17/2003 09/26/2003 SR2 C R (60) (0) Y
INSPECTION COMMENTS: COMP 46 VIOL R