Electrical Application Details for App #: M201460
Premises: 335 WEST 35 STREET MANHATTAN BIN: 1013566     Block: 759   Lot: 18
   
Application Completed and Certified

Filed: 335 W 35 ST Census Tract:   111 Health Area:  5500
122 PH/STAIRWAYS Admin Area:   M - MANHATTAN Inspection Area:   Q
NEW YORK, NY 10001 Community Board:   104
DOB Cross Street(s):    8 AVENUE,    9 AVENUE
Status:   C - JOB IS SIGNED OFF 12/10/2001
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   05/29/2001 Job Start Date:   05/23/2001
Last Change:   11/09/2001 Job End Date:   05/31/2001
Appointment Status:   
Last Inspection By:   PETER CONTEY       On     11/02/2001      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010590 Licensee Name: DEMETRIOS VOUYIOUKLIS
Firm: 000755 Firm Name: JIM ELECTRIC CORP.
Firm Phone: 718-833-2389  Firm Address: 223 52ND STREET BROOKLYN NY 11220 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
9 - OTHER
Total Fee:  $33.00
Other Work:   LL 16/84 STAIRSWAYS & PUBLIC HALL
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   O - Office Bldg
Special Cert Approval:   E - EMERGENCY LIGHTING LOCAL LAW 16/84
Advisory Board Approval:  
Owner / Occup: GVA WILLIAMS
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 51        51                
Total Units : 102 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M201460
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 11/02/2001 11/09/2001 PC2 C (60) (0) Y
INSPECTION COMMENTS: ALL EMERG LTG UNITS CHECKED & TESTED OK