![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M200598 | ||
| Premises: 954 1 AVENUE MANHATTAN | BIN: 1040157 Block: 1364 Lot: 47 |
| Application Completed and Certified | ||
| Filed: | 956 1 AV | Census Tract: 86 | Health Area: 5000 | |
| 155349 1 FL | Admin Area: M - MANHATTAN | Inspection Area: M | ||
| NEW YORK, NY 10022 | Community Board: 106 | |||
| DOB Cross Street(s): EAST 52 STREET, EAST 53 STREET | |||
| Status: C - JOB IS SIGNED OFF 07/24/2001 | |||
| Request Type: A - APPLICATION | eFiled: NO | ||
| Application Entered: 04/30/2001 | Job Start Date: 04/30/2001 | ||
| Last Change: 07/05/2001 | Job End Date: 07/30/2001 | ||
| Appointment Status: | |||
| Last Inspection By: WEISBART, F. On 06/24/2001 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 010759 | Licensee Name: | YOUNG S CHOE | |
| Firm: | 001995 | Firm Name: | Y.S ELECTRIC | |
| Firm Phone: | 866-863-4448 | Firm Address: | 129-09 26TH AVENUE, #103 FLUSHING NY 11354 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING 9 - OTHER |
Total Fee: $32.50 | ||||||
| Other Work: UPGRADING LIGHTS & POWER | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: K - Store | |||||||
| Store / Other: NAIL SALON | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | NEW CREATVE NAIL | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | 20 | 22 | 8 | 40 | 10 | |||||||
| Total Units : 100 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: ST LEVEL UNDER PROCCESING | |||
|
|