![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: M177934 | ||
| Premises: 50 CARMINE STREET MANHATTAN | BIN: 1008357 Block: 527 Lot: 57 |
| Application Completed and Certified | ||
| Filed: | 50 CARMINE ST | Census Tract: 67 | Health Area: 6400 | |
| 076901 BASEMENT | Admin Area: M - MANHATTAN | Inspection Area: R | ||
| NEW YORK, NY 10014 | Community Board: 102 | |||
| DOB Cross Street(s): BLEECKER STREET, BEDFORD STREET | |||
| Status: C - JOB IS SIGNED OFF 09/21/1999 | |||
| Request Type: P - PICK-UP | eFiled: NO | ||
| Application Entered: 05/13/1999 | Job Start Date: 06/17/1999 | ||
| Last Change: 08/26/1999 | Job End Date: 06/17/1999 | ||
| Appointment Status: | |||
| Last Inspection By: SEVERIANO JOHN On 08/25/1999 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011335 | Licensee Name: | JOSEPH RIZZO | |
| Firm: | 000993 | Firm Name: | MICHAEL RIZZO & SON LIC | |
| Firm Phone: | 212-675-3896 | Firm Address: | 255 WEST 12TH STREET ELECTRICAL CONTRACTORS NEW YORK NY 10014 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
9 - OTHER |
Total Fee: $10.00 | ||||||
| Other Work: NEW GROUND & CLAMP | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | 50 CARMINE STREET,LLC | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | R - OBJECTION(S) RESOL | |
| Power Requested: | Notice: | 05/13/1999 | |
| Power Issued: | Response: | F - FILED TO REMOVE OBJECTION 06/14/1999 |
| Follow-Up: | X - FILED APPL,NOW CLOSED 06/14/1999 | ||
| Wires Comments: TO INSTALL NEW WATER PIPE GROUND WIRE & CLAMP | |||
| Contractor's Comments: GREENWICH VILLAGE -BTWN BEDFORD ST-BLEECKER ST | |||
|
|