BIS Menu  |  Pre-BIS PA CO Query By Bin  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M096299
Premises: 32 EAST 35 STREET MANHATTAN BIN: 1017108     Block: 864   Lot: 48
   
Application Completed and Certified

Filed: 32 E 35 ST Census Tract:   74 Health Area:  5200
BSMT Admin Area:   M - MANHATTAN Inspection Area:   P
NEW YORK, NY 10016 Community Board:   106
DOB Cross Street(s):   MADISON AVENUE,    PARK AVENUE
Status:   C - JOB IS SIGNED OFF 01/22/2008
Request Type:   P - PICK-UP eFiled:   NO
Application Entered:   07/07/1992 Job Start Date:   07/24/1992
Last Change:   01/22/2008 Job End Date:   07/24/1992
Appointment Status:   
Last Inspection By:   DORSAINVILLE, R       On     01/17/2008      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 010718 Licensee Name: GEORGE HERNANDEZ
Firm: 001581 Firm Name: P&H ELECT D/B/A MAGE ELEC
Firm Phone: 718-596-2455  Firm Address: 156 FLUSHING AVENUE BROOKLYN NY 11205 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $10.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: ROCKVILLE MANGT
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  07/07/1992
Power Issued: Response: F - FILED TO REMOVE OBJECTION 08/03/1992

Follow-Up: X - FILED APPL,NOW CLOSED 08/03/1992
Wires Comments: REMOVL OF VIOLTN REPAIR WTR GRD CONN PROPLY BOND SWS
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M096299
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/24/1992 07/07/1992 HVJ W (30) (2)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(2) 01/17/2008 01/22/2008 RID C R (30) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Pre-BIS PA CO Query By Bin  |  Electrical Inspection Work Order  |  Back