|
||
NYC Department of Buildings | ||
Electrical Application Details for App #: M064045 |
Premises: 56 EAST 4 STREET MANHATTAN | BIN: 1077961 Block: 459 Lot: 14 |
Filed: | 56 E 4 ST | Census Tract: 38 | Health Area: 6500 | |
XR90598 APT 5B | Admin Area: M - MANHATTAN | Inspection Area: T | ||
NEW YORK, NY 10003 | Community Board: 103 | |||
DOB Cross Street(s): BOWERY, 2 AVENUE | |||
Status: C - JOB IS SIGNED OFF 11/29/1993 | |||
Request Type: A - APPLICATION | eFiled: NO | ||
Application Entered: 03/05/1990 | Job Start Date: 01/18/1990 | ||
Last Change: 07/20/1993 | Job End Date: 01/18/1990 |
Appointment Status: | |||
Last Inspection By: ONA, G. On 07/12/1993 | |||
Field Disp: C - INSPECTION PASSED | |||
Energize Recommendation: G - NO COMMENT | |||
Objection Disposition: |
License #: | 010689 | Licensee Name: | JOSE NUNEZ | |
Firm: | 001911 | Firm Name: | NUNEZ ELECTRIC INC. | |
Firm Phone: | 718-786-6473 | Firm Address: | 32-14 GREENPOINT AVENUE L.I.C. NY 11101 |
Work Started or Filed by Others: NO | ||||||||
Work Category: M - MINOR WORK | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $5.00 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: |
Building Used As: C - Three Family | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: | |||||||
Owner / Occup: | |||||||
Owner Business Name: | HPD | ||||||
Authorized Representative: | |||||||
Relationship To Owner: |
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
Buildings Total | 1 | |||||||||||
Total Units : 1 units |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
Power Auth Flag: | Objection Flag: | ||
Power Requested: | Notice: | ||
Power Issued: | Response: |
Follow-Up: | K - (CLOSED) | ||
Contractor's Comments: |
|