| BUILDING OVERVIEW |
Are Feeders Being Installed? : |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
2 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
1 |
|
| SUB FEEDERS (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
1 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
1 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| |
| (1) |
01/19/1990 |
02/09/1990 |
MIR |
Z |
|
|
(0) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (2) |
03/20/1990 |
03/27/1990 |
MIR |
J |
|
D |
(30) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (3) |
09/21/1990 |
09/28/1990 |
MIR |
N |
|
|
(10) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (4) |
02/24/1994 |
03/02/1994 |
IA1 |
V |
|
G |
(75) |
|
(7) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (5) |
07/29/1994 |
08/18/1994 |
JNU |
Z |
|
|
(0) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (6) |
09/01/1994 |
09/07/1994 |
JNU |
H |
X |
G |
(30) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (8) |
02/09/1995 |
02/16/1995 |
JNU |
H |
X |
G |
(30) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (9) |
08/12/1996 |
08/21/1996 |
FWE |
H |
X |
G |
(20) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (10) |
09/09/1996 |
09/17/1996 |
FWE |
C |
|
|
(5) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|