Electrical Application Details for App #: M034729
Premises: 150 EAST 91 STREET MANHATTAN BIN: 1048273     Block: 1519   Lot: 50
   
Application Completed and Certified

Filed: 150 E 91 ST Census Tract:   148.02 Health Area:  3600
APT 43-51 Admin Area:   M - MANHATTAN Inspection Area:   J
NEW YORK, NY 10128 Community Board:   108
DOB Cross Street(s):   LEXINGTON AVENUE,    3 AVENUE
Status:   C - JOB IS SIGNED OFF 03/15/1995
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   03/23/1988 Job Start Date:   03/14/1988
Last Change:   01/10/1995 Job End Date:   04/14/1988
Appointment Status:   
Last Inspection By:   PRIVATE AGENCY       On     12/27/1994      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  G - NO COMMENT
Objection Disposition:  

License #: 009286 Licensee Name: JOSESPH GAROFOLO
Firm: 000569 Firm Name: GARY ELECTRIC CO.
Firm Phone: 212-861-9226  Firm Address: 223 EAST 85TH STREET NEW YORK NY 10028 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $68.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: MOUNTER AND GLICK
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
SUB FEEDERS (EACH SET)  
A. Up to #2 CONDUCTOR  2  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  2  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 19  49  17  19                
Total Units : 112 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 2 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 03/23/1988 Notice:  
Power Issued: 03/23/1988 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M034729
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/11/1989 10/17/1989 PB1 N (30) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(2) 12/27/1994 01/10/1995 X01 C G (30) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application