| BUILDING OVERVIEW |
Are Feeders Being Installed? : |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
2 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
2 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
6 |
|
| SUB FEEDERS (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
18 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
24 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
1 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
1 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
1 |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| |
| (1) |
12/25/1987 |
01/11/1988 |
JNU |
Z |
|
|
(0) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (2) |
02/25/1988 |
02/29/1988 |
JNU |
J |
|
D |
(30) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (3) |
03/30/1988 |
04/06/1988 |
JNU |
J |
|
|
(45) |
|
(0) |
|
| INSPECTION COMMENTS:
|
TEMP GOOD INSTALLED
|
| |
| (4) |
05/17/1988 |
05/20/1988 |
JNU |
J |
|
|
(30) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (5) |
06/15/1988 |
06/17/1988 |
JNU |
J |
|
|
(30) |
|
(0) |
|
| INSPECTION COMMENTS:
|
BR CK JUST,SEE COMMENTS FOR MORE INFO
|
| |
| (6) |
07/12/1988 |
07/20/1988 |
JNU |
J |
|
|
(30) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (7) |
08/30/1988 |
09/06/1988 |
JNU |
V |
|
E |
(30) |
|
(1) |
|
| INSPECTION COMMENTS:
|
*INCLUDE LOAD CALCULATIONS
|
| |
| (8) |
10/05/1988 |
10/07/1988 |
JNU |
V |
R |
G |
(60) |
|
(2) |
|
| INSPECTION COMMENTS:
|
5-NO GROUND INSTALLED TO WATER MAIN 54-NOT PROP SIZE FOR 526 AMP CIR C.NOT FINAL INSPECTION
|
| |
| (9) |
04/03/1989 |
04/06/1989 |
JNU |
V |
R |
G |
(30) |
|
(2) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (10) |
07/20/1989 |
07/27/1989 |
DH1 |
J |
Y |
E |
(115) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (11) |
08/16/1989 |
08/30/1989 |
DH1 |
J |
Y |
E |
(120) |
|
(0) |
|
| INSPECTION COMMENTS:
|
NONE
|
| |
| (12) |
10/16/1989 |
10/17/1989 |
DH1 |
C |
R |
E |
(85) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|