BIS Menu  |  After Hours Variance Permits  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: M011254
Premises: 244 EAST 60 STREET MANHATTAN BIN: 1043349     Block: 1414   Lot: 30
   
Application Completed and Certified

Filed: 244 E 60 ST Census Tract:   110 Health Area:  4900
BASEMENT Admin Area:   M - MANHATTAN Inspection Area:   M
NEW YORK, NY 10022 Community Board:   108
DOB Cross Street(s):    3 AVENUE,    2 AVENUE
Status:   C - JOB IS SIGNED OFF 09/18/1992
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   11/12/1986 Job Start Date:   11/07/1986
Last Change:   08/31/1992 Job End Date:   11/07/1986
Appointment Status:   
Last Inspection By:   ROGALEWSKI, M       On     08/19/1992      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  G - NO COMMENT
Objection Disposition:  

License #: 009521 Licensee Name: GARY LEVINE
Firm: 000570 Firm Name: GARY ELECTRIC CORP.
Firm Phone: 718-388-2460  Firm Address: 87 GUERNSEY STREET BROOKLYN NY 11222 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
9 - OTHER
Total Fee:  $17.00
Other Work:   STEAM BOILER&HOT HEATER
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: PALEY MGT CORP
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  NONE

 
Inspection Details
 

INSPECTION FOR APPLICATION #: M011254
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 11/28/1986 12/16/1986 SR2 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(2) 01/23/1987 02/19/1987 SR2 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(3) 03/06/1987 04/08/1987 SR2 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(4) 04/17/1987 05/05/1987 GO1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(5) 05/20/1987 05/28/1987 DR1 L (0) (0)
INSPECTION COMMENTS: COULD NOT FIND BULLETON#8
 
(6) 08/19/1992 08/31/1992 MIR C G (30) (0)
INSPECTION COMMENTS: /




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  After Hours Variance Permits  |  Electrical Inspection Work Order  |  Back