BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: K08874
Premises: 153 CLINTON AVENUE BROOKLYN BIN: 3054301     Block: 1888   Lot: 2
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 153 CLINTON AV Census Tract:   191 Health Area:  1410
BASEMENT ETC Admin Area:   B - BROOKLYN Inspection Area:   D
BROOKLYN, NY 11205 Community Board:   302
DOB Cross Street(s):   PARK AVENUE,    MYRTLE AVENUE
Status:   P - OBJECTN PENDING AT CONTRACTOR 11/15/2021
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   08/14/1984 Job Start Date:   08/20/1984
Last Change:   11/15/2021 Job End Date:   09/03/1984
Appointment Status:   
Last Inspection By:   JOHN, CHARLES       On     11/15/2021      
Field Disp:   V - OBJCTN ISSD: JOB INCOMPLT
Energize Recommendation:  D - DON'T ISSUE POWER AUTH
Objection Disposition:  Y - PARTLY REMOVED

License #: 010955 Licensee Name: ROMAN KATSNELSON
Firm: 000483 Firm Name: ENTERPRISES ELECTR CONTR
Firm Phone: 718-437-2700  Firm Address: 41 TERRACE PLACE INC BROOKLYN NY 11218 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
Total Fee:  $513.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: TRIANGLE REHAB CORP
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: R - REQUESTED Objection Flag: V - OBJECTION(S) EXIST
Power Requested: 05/28/1986 Notice: 1 - FIRST NOTICE 11/15/2021
Power Issued: Response:  

Follow-Up:
Wires Comments: 1-400 AMP 3 PHASE SERVICE SWITCH 16-3 WIRE METER PANS PANELS ETC
Contractor's Comments:  E

 
Inspection Details
 

INSPECTION FOR APPLICATION #: K08874
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/24/1985 LDM Z Y D (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(2) 05/02/1986 05/21/1986 SC1 Z (0) (0)
INSPECTION COMMENTS: THIS ADDRESS NOT IN AREA C
 
(3) 06/13/1986 07/09/1986 SC1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(4) 08/08/1986 08/26/1986 WMK Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(5) 10/30/1986 11/05/1986 WMK N (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(6) 07/10/1987 07/27/1987 KIW Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(7) 08/07/1987 08/18/1987 KIW Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(8) 08/21/1987 09/04/1987 KIW Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(9) 02/02/1990 02/22/1990 HJG Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(10) 08/17/1990 09/06/1990 HJG Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(11) 08/22/1992 08/26/1992 LF1 N (20) (0)
INSPECTION COMMENTS: DEPT OF BLDG REG#337457
 
(12) 11/03/1995 11/18/1995 MC1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(13) 12/01/1995 12/22/1995 MC1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(14) 12/29/1995 01/22/1996 MC1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(15) 01/26/1996 02/20/1996 MC1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(16) 02/29/1996 03/12/1996 MC1 P (40) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(17) 11/03/2021 11/03/2021 CJH N (16) (0) Y
INSPECTION COMMENTS: NO SHOW
 
(18) 11/15/2021 11/15/2021 CJH V (49) (2)
INSPECTION COMMENTS: FAIL COMPLETE INSPECTION CONTRACTOR NEED TO ADD SCOPE OF WORK NOT COMMENT

OBJECTION FOR APPLICATION #: K08874
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (176) INSTALLATION DOES NOT MEET CODE REQUIREMENTS
(CELLAR) CELLAR GND RACEWAY NOT CONTINUOUS AT WATER METER 250.64
OPEN 11/15/2021 11/15/2021
 
002 (176) INSTALLATION DOES NOT MEET CODE REQUIREMENTS
(CELLAR)CONTRACTOR NEED TO ADD 1 400A 3 PH SVC SWITCH TOTAL 1 1 SET 500 MCMTOTAL 1 16-3 WIRE METER PAN 16 PANELS TOTAL 16 16 FEEDER CONDUCTORSTOTAL 16
OPEN 11/15/2021 11/15/2021



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order