| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
2 |
COMBO |
| B. 101 Up to 200 AMPS |
1 |
200 AMPS KNIFE SWITCH |
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
7 |
6 X #6 AWG, 1 X #4 AWG |
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
1 |
350 MCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 18) |
DEFECTIVE RECEPTACLES ARE IN USE (FLOOR: 001)DEFECTIVE BATHROOM GFCI (CONDUCTOR WONT LOCK IN PLACE WITH SCREW).ART. 110.2 |
RSLV |
05/11/2019 |
05/11/2019 |
05/16/2019 |
| |
| 002 |
( 34) |
KNOCKOUTS ARE NOT CLOSED IN PANEL BOX (FLOOR: 003) KO IN PANEL. ART. 110.12(A) |
RSLV |
05/11/2019 |
05/11/2019 |
05/16/2019 |
| |
| 003 |
(102) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED (ALL FLOORS)EGC FROM MC CABLE IS BEING USED AS TRAVELER CONDUCTOR FOR ALL S.D'S.ART. 330.108 |
RSLV |
05/11/2019 |
05/11/2019 |
05/16/2019 |
| |
| 004 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (ALL FLOORS)ALL MC CABLES TO S.D.'S DO NOT HAVE EGC'S TO BOX. ART. 250.148 |
RSLV |
05/11/2019 |
05/11/2019 |
05/16/2019 |
| |
| 005 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (ALL FLOORS)EGC'S FROM MC CABLES HAVE EITHER CUTOUT OR NOT TERMINATED IN PANELST-OUT. ART. 250.148 |
RSLV |
05/11/2019 |
05/11/2019 |
05/29/2019 |
| |
| 006 |
(231) |
NO OTHER OUTLET (ALL FLOORS)KITCHEN GFCI'S ARE SHARED WITH LIGHTING CKT'S T-OUT. ART.210.52(B)(2) |
RSLV |
05/11/2019 |
05/11/2019 |
05/16/2019 |
| |
| 007 |
(231) |
NO OTHER OUTLET (ALL FLOORS)INDOOR AC CKT'S ARE SHARED WITH LIVING ROOM CKT'S T-OUT. AMEND.210.11(4) |
RSLV |
05/11/2019 |
05/11/2019 |
05/16/2019 |
| |
| 008 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY (ALL FLOORS) ALL DIRECTORY ARE MISSED LABELED. ART. 408.4 |
RSLV |
05/11/2019 |
05/11/2019 |
05/16/2019 |
| |
| 009 |
( 59) |
AFCI PROTECTION HAS NOT BEEN PROVIDED (ALL FLOORS) ALL S.D.'S ARE AFCI PROTECTED. ART. 210.12(B) |
RSLV |
05/11/2019 |
05/11/2019 |
05/16/2019 |
| |
| 010 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (BASEMENT) OCPD'S IN PLP AE=RE NOT FOR USE WITH PANEL. ART. 110.3(B) |
RSLV |
05/11/2019 |
05/11/2019 |
05/29/2019 |
| |
| 011 |
(999) |
OTHER (BASEMENT) CONTRACTOR MUST FILE FOR F.A. |
RSLV |
05/11/2019 |
05/11/2019 |
05/29/2019 |
| |
| 012 |
(999) |
OTHER (OPEN SPACE) (ART. 210.70(A2)) ENTER LIGHTING FOR LIFT |
RSLV |
05/16/2019 |
05/16/2019 |
05/29/2019 |