![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B437492 | ||
| Premises: 575 4 AVENUE BROOKLYN | BIN: 3428584 Block: 1052 Lot: 5 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 581 4TH AV | Census Tract: 141 | Health Area: 4700 | |
| HOIST | Admin Area: B - BROOKLYN | Inspection Area: F | ||
| BROOKLYN, NY 11215 | Community Board: 307 | |||
| DOB Cross Street(s): 16 STREET, PROSPECT AVENUE | |||
| Status: C - JOB IS SIGNED OFF 05/10/2021 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 11/21/2017 9:12 AM | |
| Application Entered: 11/21/2017 | Job Start Date: 11/21/2017 | ||
| Last Change: 05/10/2021 | Job End Date: 06/30/2019 | ||
| Appointment Status: | |||
| Last Inspection By: JOHN HUGHES On 05/10/2021 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 012021 | Licensee Name: | VAN P VASSELL | |
| Firm: | 003699 | Firm Name: | V. VASS ELECTRIC CORP | |
| Firm Phone: | 718-325-7830 | Firm Address: | 3542 EASTCHESTER ROAD BRONX NY 10469 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT |
Total Fee: $165.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: HOIST | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | PILKU CONSTRUCTION | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: POWER CONNECTION FROM SECONDARY SIDE OF TRANSFORMER TO PERSONNEL AND MATERIAL HOIST | |||
|
|