![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B434656 | ||
| Premises: 2951 BRAGG STREET BROOKLYN | BIN: 3255300 Block: 8815 Lot: 530 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 2951 BRAGG ST | Census Tract: 622 | Health Area: 8900 | |
| FIRST FLOOR | Admin Area: B - BROOKLYN | Inspection Area: P | ||
| BROOKLYN, NY 11235 | Community Board: 315 | |||
| DOB Cross Street(s): EMMONS AVENUE, DEAD END | |||
| Status: C - JOB IS SIGNED OFF 02/26/2018 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 09/20/2017 10:32 PM | |
| Application Entered: 09/20/2017 | Job Start Date: 09/20/2017 | ||
| Last Change: 02/26/2018 | Job End Date: 12/20/2017 | ||
| Appointment Status: | |||
| Last Inspection By: WEISBART, F. On 12/08/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 012024 | Licensee Name: | TIMOTHY COLEMAN | |
| Firm: | 003668 | Firm Name: | TIMOTHY COLEMAN LICENSED | |
| Firm Phone: | 718-337-0921 | Firm Address: | 19-14 MOTT AVENUE ELECTRICIAN FAR ROCKAWAY NY 11691 | |
| Removal of ECB Violation(s): 35289682Y | ||||||||
| Work Started or Filed by Others: YES | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $40.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: HOMELESS SHELTER | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | JOE COHEN | ||||||
| Owner Business Name: | 3206 EMMONS AVE REALTY LL | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 001 | 1 | |||||||||||
| Buildings Total | 1 | |||||||||||
| Total Units : 1 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: REMOVAL OF ECB VIOLATION #35289682Y. FAILURE TO GROUND ELECTRICAL SYSTEM | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 12/08/2017 | 12/11/2017 | FWE | C | (30) | (0) | Y | |||
| INSPECTION COMMENTS: | OK | |||||||||