Electrical Application Details for App #: B432211
Premises: 137 COLUMBIA HEIGHTS BROOKLYN BIN: 3001752     Block: 234   Lot: 37
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 141 COLUMBIA HEIGHTS Census Tract:   3.01 Health Area:  2300
OUTSIDE/STREET LEVEL Admin Area:   B - BROOKLYN Inspection Area:   C
BROOKLYN, NY 11201 Community Board:   302
DOB Cross Street(s):   CLARK STREET,    PIERREPONT STREET
Status:   I - AWAITING INSPECTION REQUEST
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/31/2017 2:28 PM
Application Entered:   07/31/2017 Job Start Date:   07/31/2017
Last Change:   07/31/2017 Job End Date:   07/31/2018
Appointment Status:   
Last Inspection By:          On          
Field Disp:   
Energize Recommendation:  
Objection Disposition:  

License #: 010377 Licensee Name: MICHAEL BAPTISTE
Firm: 002413 Firm Name: WCK ELECTRIC CORP.
Firm Phone: 917-909-1048  Firm Address: 1274 PROSPECT AVENUE BROOKLYN NY 11218 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $40.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: 141 COLUMBIA HEIGHTS,
Authorized Representative:  MICHAEL BAPTISTE
Relationship To Owner:   SUB-CONTRACTOR


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND                     
Buildings Total                     
Total Units : 9 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up:
Contractor's Comments:  INSTALLATION OF LIGHTING FOR SIDEWALK SHED. 127 LF

 
 

*NO INSPECTION RECORDS FOUND FOR ELECTRICAL APPLICATION NUMBER B432211
INSPECTION FOR APPLICATION #: B432211
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order