Electrical Application Details for App #: B427325
Premises: 27 PINE STREET BROOKLYN BIN: 3091654     Block: 4118   Lot: 9
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 27 PINE ST Census Tract:   1176.02 Health Area:  3900
WHOLE BUILDING Admin Area:   B - BROOKLYN Inspection Area:   U
BROOKLYN, NY 11208 Community Board:   305
DOB Cross Street(s):   ETNA STREET,    RIDGEWOOD AVENUE
Status:   I - AWAITING INSPECTION REQUEST
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  04/21/2017 7:39 AM
Application Entered:   04/21/2017 Job Start Date:   04/21/2017
Last Change:   04/21/2017 Job End Date:   04/21/2018
               COMPLETION FEE WAS BILLED
Appointment Status:   
Last Inspection By:          On          
Field Disp:   
Energize Recommendation:  
Objection Disposition:  

License #: 011015 Licensee Name: ERROL G GLANVILLE
Firm: 002353 Firm Name: THROOP ELECTRIC CO., INC.
Firm Phone: 718-282-8201  Firm Address: 610 ROGERS AVENUE BROOKLYN NY 11225 

Work Started or Filed by Others: YES
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
7 - HVAC WIRING
Total Fee:  $168.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   B - Two Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: LIQUAT KHAN
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  3  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  3  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  2  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS    22  16               
001    11  16               
002    11  16               
Buildings Total 44  48    25  10                
Total Units : 127 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 3 #4-Wire 0 #10-Wire 0
Existing Meters 2 + New Meters 3 - Removed Meters 2 = Total Meters 3

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 04/21/2017 Notice:  
Power Issued: 04/21/2017 Response:  

Follow-Up:
Contractor's Comments:  HELLO. WE ARE TAKING THIS JOB OVER FROM FORMER ELECTRICIAN.

 
 

*NO INSPECTION RECORDS FOUND FOR ELECTRICAL APPLICATION NUMBER B427325
INSPECTION FOR APPLICATION #: B427325
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order