Electrical Application Details for App #: B422301
Premises: 76 PROSPECT PARK WEST BROOKLYN BIN: 3025487     Block: 1081   Lot: 43
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 78 PROSPECT PARK W Census Tract:   165 Health Area:  4500
1ST FLOOR Admin Area:   B - BROOKLYN Inspection Area:   D
BROOKLYN, NY 11215 Community Board:   306
DOB Cross Street(s):    3 STREET,    4 STREET
Status:   C - JOB IS SIGNED OFF 06/23/2020 Balance Paid By Owner
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  01/09/2017 8:21 AM
Application Entered:   01/09/2017 Job Start Date:   01/15/2017
Last Change:   06/23/2020 Job End Date:   01/01/2018
Appointment Status:   
Last Inspection By:   SERGIY MOTORIN       On     06/16/2020      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 011509 Licensee Name: MORGAN J TOREN
Firm: 002978 Firm Name: A.C. MORGAN ELECTRIC
Firm Phone: 718-549-6800  Firm Address: 3601 RIVERDALE AVENUE BRONX NY 10463 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $137.75
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ENRI GJINAJ
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  3  20 CKT 1 PHASE
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
001  1 B  30  20               
001  1D  40  25               
001  1E  40  30  10               
Buildings Total 110  75  10  26                  
Total Units : 221 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice: C - CALL TO OFFICE 02/28/2020
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B422301
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 12/18/2019 12/18/2019 NJP V (35) (4)
INSPECTION COMMENTS: OBJECTION ISSUED. NOT A FINAL INSPECTION. ACCESS WAS GRANTED TO ALL LISTED APTS. CONTRACTOR HAS TO CHECK SCOPE OF WORK AND FILE FOR MISSING DEVICES. FULL INSPECTION REQUIRED.
 
(2) 02/28/2020 02/28/2020 CLX V X (30) (1)
INSPECTION COMMENTS: NO ACCESS TO 1B TO VERIFY CONDITIONS RESOLVED , APT 1E 1D INSPECTED NEW OBJECTIONS ISSUED
 
(3) 03/16/2020 03/16/2020 DJG N (20) (0) Y
INSPECTION COMMENTS: FAIL. NO SHOW. CONTRACTOR WILL RESCHEDULE.
 
(4) 06/16/2020 06/16/2020 SGY C R (20) (0)
INSPECTION COMMENTS: OBJECTIONS RESOLVED.

OBJECTION FOR APPLICATION #: B422301
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (999) OTHER
(FLOOR: 001) UNUSED OPENING FOR ENCLOSURE/PANEL COVER (ART 408.7)
RSLV 12/18/2019 12/18/2019 06/16/2020
 
002 (999) OTHER
(FLOOR: 001)15 AMP RECEP WITH 20 AMP OCP/APPLIANCE/BATHROOM CKTS RECEP HAS NOTINSTALLED AS PER CODE (ART 210.21)
RSLV 12/18/2019 12/18/2019 06/16/2020
 
003 (999) OTHER
(ALL FLOORS)AFCI PROTECTION HAS NOT BEEN PROVIDED FOR NECESSARY CKTS THROUGHOUTAPTS (ART 210.12)
RSLV 12/18/2019 12/18/2019 06/16/2020
 
004 (999) OTHER
(ALL FLOORS)THROUGHOUT BREAKERS/PANEL COVER ARE NOT LISTED (ART 110.3B)
RSLV 12/18/2019 12/18/2019 06/16/2020
 
005 (128) NEUTRAL IS GROUNDED BEYOND LOAD SIDE OF SERVICE SWITCH
(FLOOR: 001) APT 1D PANEL NEUTRAL IS BONDED AFTER SERVICE
RSLV 02/28/2020 02/28/2020 06/16/2020