| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
1 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
2 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
7 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
2 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
6 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(145) |
APPLIANCE DISCONNECT NOT PROVIDED/IDENTIFIED. (CELLAR) HOT WATER DS'S AT CELLAR NOT LABELED/INSPECTED. ART. 110.22 |
RSLV |
08/17/2020 |
08/17/2020 |
09/14/2020 |
| |
| 002 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (GROUND FLOOR)NO EGC FOR 30A WATER HTR AT BTH RM CEILING. ART. 427.29 / 250.122 |
RSLV |
08/17/2020 |
08/17/2020 |
09/14/2020 |
| |
| 003 |
( 61) |
INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS (GROUND FLOOR)NO SWITCH/ES INSTALLED FOR LIGHTING AT COMMERCIAL SPACE. ART.210.70.C |
RSLV |
08/17/2020 |
08/17/2020 |
09/14/2020 |
| |
| 004 |
( 61) |
INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS (GROUND FLOOR)SETBACK AT BTH RM RECEP AT COMMERCIAL SPACE. ART. 314.20 |
RSLV |
08/17/2020 |
08/17/2020 |
09/14/2020 |
| |
| 005 |
(999) |
OTHER (ALL FLOORS)CONTRACTOR NEEDS TO REFILE FOR ENTIRE BUILDING FOR ALL OLD AND NEWSCOPE OF WORK, SERVICE WORK, GENERAL WIRING AND HVAC UNITSTHROUGHOUT |
RSLV |
09/14/2020 |
09/14/2020 |
10/29/2020 |