![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B419423 | ||
| Premises: 488 4 AVENUE BROOKLYN | BIN: 3022819 Block: 1021 Lot: 45 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 488 4TH AV | Census Tract: 117 | Health Area: 4300 | |
| STREET | Admin Area: B - BROOKLYN | Inspection Area: F | ||
| BROOKLYN, NY 11215 | Community Board: 306 | |||
| Special Place Name: HOIST | ||||
| DOB Cross Street(s): 11 STREET, 12 STREET | |||
| Status: C - JOB IS SIGNED OFF 11/22/2018 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 10/31/2016 3:37 PM | |
| Application Entered: 10/31/2016 | Job Start Date: 10/31/2016 | ||
| Last Change: 11/22/2018 | Job End Date: 10/31/2018 | ||
| Appointment Status: | |||
| Last Inspection By: NAJI PHILLIIPS On 11/14/2018 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011681 | Licensee Name: | PAUL OLSEN | |
| Firm: | 004266 | Firm Name: | NASH ELECTRIC SERVICES IN | |
| Firm Phone: | 646-688-3350 | Firm Address: | 286 EAST 236TH STREET BRONX NY 10470 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
2 - TEMPORARY CONSTRUCTION 3 - ELEVATOR/ESCALATOR/MATERIAL LIFT |
Total Fee: $210.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Other | |||||||
| Store / Other: HOIST | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | COLGATE ENTERPRISE CORP | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| SWK | 2 | |||||||||||
| Buildings Total | 2 | |||||||||||
| Total Units : 2 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: PERMIT FOR MATERIAL HOIST ONLY. CONNECT FROM SECONDARY SIDEOF TRANSFORMER (SUPPLIED BY OTHERS) TO MATERIAL HOIST | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 11/14/2018 | 11/15/2018 | NJP | C | (25) | (0) | Y | |||
| INSPECTION COMMENTS: | TEMP HOIST HAS BEEN REMOVED. | |||||||||