| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
400A |
| D. 601 Up to 1200 AMPS |
2 |
800A |
| E. Over 1200 AMPS |
1 |
1600A |
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
4 |
4-3#8 |
| B. Over #2 to 1/0 |
34 |
1-3#1,1-4#1/0,6-4#3/0,25- |
| C. Over 1/0 to 250 MCM |
6 |
3#3/0 |
| D. Over 250 MCM |
10 |
9-4-600KCM,1-4#350KCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
32 |
|
| C. 3 Phase Up to 225 AMPS |
2 |
|
| D. 3 Phase Over 225 AMPS |
1 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
2 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER (ALL FLOORS) ALL SVC EQIUP . ARE NOT LABELED ARTL . 110 . 22 |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |
| |
| 002 |
( 30) |
OUTLET BOXES ARE NOT SECURED (BASEMENT) MTR BANK TAP BOXES ARE NOT PROPERLY SECURED |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |
| |
| 003 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (BASEMENT) MAIN GROUND AT WTR |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |
| |
| 004 |
(999) |
OTHER (BASEMENT)SVC CONDTS' ARE SPLICED IN (2) 800 A SVC SW. ARTL 230 . 43 |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |
| |
| 005 |
(999) |
OTHER (BASEMENT) JUMPER IS NOT PROPERLY SIZED ARTL .250 . 104 |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |
| |
| 006 |
(999) |
OTHER (BASEMENT) NEUTRAL IS NOT PROVIDED IN FP SVC SW ARTL .250 . 24 (C) |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |
| |
| 007 |
(999) |
OTHER (BASEMENT) FP RACEWAY IS NOT ENCASED IN CONCRETE ARTL .695 . 6 (B) |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |
| |
| 008 |
(999) |
OTHER (BASEMENT) NETWORK LAYOUT COMPARTMENT IE NOT AS PER DRAWING |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |
| |
| 009 |
(999) |
OTHER (BASEMENT) VAULT ABOVE FLOOR GRADE IS NOT LABLED ARTL . 230 . 1 |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |
| |
| 010 |
(999) |
OTHER (BASEMENT) DEVICES SETBACK IN KITCHEN BACKSPLASH ARTL . 314 . 20 |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |
| |
| 011 |
(999) |
OTHER (BASEMENT) RECEPTACLES INSTALLED IN GYM FACE - UP ARTL 406 . 6 (F) |
RSLV |
09/07/2018 |
09/07/2018 |
01/29/2019 |