![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B412849 | ||
| Premises: 232 STANHOPE STREET BROOKLYN | BIN: 3074483 Block: 3269 Lot: 18 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 232 STANHOPE ST | Census Tract: 431 | Health Area: 3300 | |
| 1,2 FLOORS | Admin Area: B - BROOKLYN | Inspection Area: E | ||
| BROOKLYN, NY 11237 | Community Board: 304 | |||
| DOB Cross Street(s): KNICKERBOCKER AVENUE, IRVING AVENUE | |||
| Status: C - JOB IS SIGNED OFF 12/10/2016 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 06/13/2016 7:19 AM | |
| Application Entered: 06/13/2016 | Job Start Date: 06/13/2016 | ||
| Last Change: 12/10/2016 | Job End Date: 12/13/2016 | ||
| Appointment Status: | |||
| Last Inspection By: ROBINSON HEATH On 11/02/2016 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 012359 | Licensee Name: | JOHN S KARALIS | |
| Firm: | 003811 | Firm Name: | TRIBORO ELEC'L CONTR'G CO | |
| Firm Phone: | 718-786-0913 | Firm Address: | 39-02 29TH STREET LONG ISLAND CITY NY 11101 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $159.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | PB TITAN HOMES | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 001 | 1 | 20 | 2 | 8 | 12 | |||||||
| 001 | 2 | 20 | 2 | 8 | 12 | |||||||
| 002 | 3 | 20 | 2 | 8 | 12 | |||||||
| Buildings Total | 60 | 6 | 24 | 36 | ||||||||
| Total Units : 126 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | 1 - FIRST NOTICE 10/07/2016 | |
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: RENOVATION OF TWO APTS 1ST FLOOR AND ONE APT 2ND FLOOR. | |||
|
|