BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B410886
Premises: 125 EASTERN PARKWAY BROOKLYN BIN: 3029629     Block: 1179   Lot: 61
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 125 EASTERN PARKWAY Census Tract:   215 Health Area:  2720
APT 5A Admin Area:   B - BROOKLYN Inspection Area:   D
BROOKLYN, NY 11238 Community Board:   308
DOB Cross Street(s):   UNDERHILL AVENUE,    WASHINGTON AVENUE
Status:   C - JOB IS SIGNED OFF 03/31/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  04/30/2016 3:43 PM
Application Entered:   04/30/2016 Job Start Date:   05/01/2016
Last Change:   03/31/2017 Job End Date:   07/26/2016
Appointment Status:   
Last Inspection By:   JOHN, CHARLES       On     12/15/2016      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 010102 Licensee Name: GEORGE HOLNESS
Firm: 002832 Firm Name: GEORGE HOLNESS
Firm Phone: 347-945-2512  Firm Address: 3870 WHITE PLAINS ROAD BRONX NY 10467 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $45.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: DEVON TEAPE
Owner Business Name: TEAPE CONSTRUCTION
Authorized Representative:  DEVON TEAPE
Relationship To Owner:   CONTRACTOR


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
001  5A  12    12             
Buildings Total 12    12                
Total Units : 31 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice: 1 - FIRST NOTICE 11/25/2016
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  WIRING FOR LIGHTS SWITCHES AND RECEPTACLES

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B410886
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 11/22/2016 11/25/2016 CCH V (65) (1)
INSPECTION COMMENTS: JOB FAIL
 
(2) 12/15/2016 12/16/2016 CJH C R (49) (0)
INSPECTION COMMENTS: OBJECTION REMOVED

OBJECTION FOR APPLICATION #: B410886
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (999) OTHER
(FLOOR: 005) G F C I NOT TAMPER PROOF 406.11
RSLV 11/22/2016 11/22/2016 12/15/2016



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order