![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B409029 | ||
| Premises: 416 PACIFIC STREET BROOKLYN | BIN: 3001135 Block: 190 Lot: 16 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 416 PACIFIC ST | Census Tract: 41 | Health Area: 2400 | |
| B-1-2-3 | Admin Area: B - BROOKLYN | Inspection Area: C | ||
| BROOKLYN, NY 11217 | Community Board: 302 | |||
| DOB Cross Street(s): BOND STREET, NEVINS STREET | |||
| Status: C - JOB IS SIGNED OFF 02/28/2017 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 03/22/2016 8:27 AM | |
| Application Entered: 03/22/2016 | Job Start Date: 03/22/2016 | ||
| Last Change: 02/28/2017 | Job End Date: 12/15/2016 | ||
| Appointment Status: | |||
| Last Inspection By: ADMINISTRATION On 02/28/2017 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 010523 | Licensee Name: | VINCENT VERDEROSA | |
| Firm: | 001698 | Firm Name: | SUPER CHARGED ELEC. INC. | |
| Firm Phone: | 718-981-7173 | Firm Address: | 2 DUBOIS AVENUE STATEN ISLAND NY 10310 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING 7 - HVAC WIRING |
Total Fee: $91.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: B - Two Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | M MORRIS | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| GND | 29 | 22 | 11 | 29 | 1 | 1 | ||||||
| 001 | 31 | 16 | 12 | 31 | 1 | 1 | ||||||
| 002 | 8 | 5 | 3 | 8 | 1 | 1 | ||||||
| 003 | 2 | 2 | 2 | |||||||||
| Buildings Total | 70 | 43 | 28 | 70 | 3 | |||||||
| Total Units : 214 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | 1 - FIRST NOTICE 01/20/2017 | |
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: GENERAL WIRING , HAVC | |||
|
|