![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B408636 | ||
| Premises: 209 CLINTON STREET BROOKLYN | BIN: 3003056 Block: 292 Lot: 4 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 209 CLINTON ST | Census Tract: 45 | Health Area: 2300 | |
| 4D 4TH FLOOR | Admin Area: B - BROOKLYN | Inspection Area: C | ||
| BROOKLYN, NY 11201 | Community Board: 306 | |||
| DOB Cross Street(s): PACIFIC STREET, AMITY STREET | |||
| Status: C - JOB IS SIGNED OFF 06/03/2016 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 03/14/2016 3:57 PM | |
| Application Entered: 03/14/2016 | Job Start Date: 03/14/2016 | ||
| Last Change: 06/03/2016 | Job End Date: 03/13/2017 | ||
| Appointment Status: | |||
| Last Inspection By: ROBINSON HEATH On 03/23/2016 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 012754 | Licensee Name: | ALEXANDER MERZLYAK | |
| Firm: | 003893 | Firm Name: | L&B ELEC'L INTERNATIONAL | |
| Firm Phone: | 347-295-0380 | Firm Address: | 150-50 11TH AVENUE WHITESTONE NY 11357 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $57.75 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | EDEN PONTZ | ||||||
| Owner Business Name: | 209 TENANTS CORP. | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 004 | D | 40 | 6 | 17 | 12 | 1 | 6 | |||||
| Buildings Total | 40 | 6 | 17 | 12 | 6 | |||||||
| Total Units : 81 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 03/23/2016 | 03/24/2016 | HRB | C | (35) | (0) | Y | |||
| INSPECTION COMMENTS: | PASSED | |||||||||