| Electrical Application Details for App #: B408452 | ||
| Premises: 240 LIVINGSTON STREET BROOKLYN | BIN: 3329443 Block: 165 Lot: 22 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 250 LIVINGSTON ST | Census Tract: 37 | Health Area: 2400 | |
| BASEMENT | Admin Area: B - BROOKLYN | Inspection Area: C | ||
| BROOKLYN, NY 11201 | Community Board: 302 | |||
| DOB Cross Street(s): ELM PLACE, BOND STREET | |||
| Status: C - JOB IS SIGNED OFF 10/19/2020 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 03/09/2016 3:48 PM | |
| Application Entered: 03/09/2016 | Job Start Date: 03/15/2016 | ||
| Last Change: 10/19/2020 | Job End Date: 06/30/2016 | ||
| Appointment Status: | |||
| Last Inspection By: NAJI PHILLIIPS On 10/07/2020 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 012520 | Licensee Name: | RICHARD E CHIAPPA | |
| Firm: | 004443 | Firm Name: | RC3 ELECTRIC, LLC | |
| Firm Phone: | 718-881-8070 | Firm Address: | 4465 BRONX BLVD BRONX NY 10470 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $210.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Commercial/Residential (1 Stores, 5 Apartments) | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | BERTIE ST. MARTIN | ||||||
| Owner Business Name: | VERIZON WIRELESS | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 1 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 1 | - Removed Meters | 0 | = Total Meters | 1 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 03/09/2016 | Notice: | C - CALL TO OFFICE 09/14/2020 |
| Power Issued: | 03/09/2016 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: WE WILL BE INSTALLING A 200 AM 3 PHASE SERVICE FOR VERIZON WIRELESS CELL SITE. | |||
|
|