BIS Menu  |  Property Profile  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B404664
Premises: 109 MONTGOMERY STREET BROOKLYN BIN: 3029723     Block: 1190   Lot: 61
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 109 MONTGOMERY ST Census Tract:   213 Health Area:  2720
SIDEWALK SHED Admin Area:   B - BROOKLYN Inspection Area:   D
BROOKLYN, NY 11225 Community Board:   309
DOB Cross Street(s):   WASHINGTON AVENUE,    FRANKLIN AVENUE SHUTTLE LINE
Status:   C - JOB IS SIGNED OFF 10/19/2020
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  12/10/2015 9:52 PM
Application Entered:   12/10/2015 Job Start Date:   12/10/2015
Last Change:   10/19/2020 Job End Date:   12/31/2016
Appointment Status:   
Last Inspection By:   DALTON HENLON       On     10/17/2020      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 012021 Licensee Name: VAN P VASSELL
Firm: 003699 Firm Name: V. VASS ELECTRIC CORP
Firm Phone: 718-325-7830  Firm Address: 3542 EASTCHESTER ROAD BRONX NY 10469 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $50.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   SIDEWALK SHED
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: TRIBOROUGH SCAFFOLDING
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND    26        26             
Buildings Total 26        26                
Total Units : 52 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  WIRING FOR 373 LINEAR FEET OF SIDEWALK SHED, 26 LIGHT FIXTURES

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B404664
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 10/17/2020 10/19/2020 DAH C (12) (0) Y
INSPECTION COMMENTS: THE SHED IS REMOVED .




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Property Profile  |  Electrical Inspection Work Order  |  Back