| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
1 |
200 AMP |
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
2 |
THREE #2 |
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
1 |
THREE #3/AWG |
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
2 |
TWO 42 CIRCUIT |
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (FLOOR: 001)1 FLR- METAL BOXES MUST BE GROUNDED 314.4/ WITH MC CABLE INSTALLEDAT KITCHEN ISLAND. |
RSLV |
03/07/2023 |
03/07/2023 |
06/13/2023 |
| |
| 002 |
( 18) |
DEFECTIVE RECEPTACLES ARE IN USE (ALL FLOORS)110.2(A), GFCI RECEPTACLE AND MEDICINE CABINET RECEPTACLE DEFECTIVEAT BATH RM AND POWDER RM, THRU-OUT. |
RSLV |
03/07/2023 |
03/07/2023 |
06/13/2023 |
| |
| 003 |
(999) |
OTHER (ALL FLOORS)CONTRACTOR NEED TO REFILE OLD APPS FOR MISSING FEEDER, 4 SET OVER1/0 TO 250 MCM, TOTAL 5 SET INSTALLED, MOTORS, HEATER, AND FLRDESCRIPTION, 3 FLRS, ROOF DEVICES AND EQUIP INSTALLED. |
RSLV |
03/07/2023 |
03/07/2023 |
06/13/2023 |
| |
| 004 |
(129) |
SERVICE SWITCH NEUTRAL NOT BONDED TO ENCLOSURE (BASEMENT)BASE-AT SER SW- MAIN BONDING SCREW NOT GREEN FINISH/JUMPER NOTINSTALLED 250.28(B). |
RSLV |
03/07/2023 |
03/07/2023 |
06/13/2023 |
| |
| 005 |
(192) |
CONDUCTORS ARE OVER FUSED AS PER TABLE 310.16 (BASEMENT)AT PANELS-#10, CONDUCTORS ARE OVER FUSED (TABLE 310.16) 310.16/ WITH40 AMP BREAKER. |
RSLV |
03/07/2023 |
03/07/2023 |
06/13/2023 |
| |
| 006 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY (BASEMENT) BASE-408.4 DIRECTORY INCOMPLETE PROVIDED. |
RSLV |
03/07/2023 |
03/07/2023 |
06/13/2023 |
| |
| 007 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (BASEMENT)SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY 250.24(C)/ NEUTRAL NOT LANDED ON NEUTRAL BUS. |
RSLV |
03/07/2023 |
03/07/2023 |
06/13/2023 |
| |
| 008 |
( 53) |
GFCI HAS NOT BEEN PROVIDED (BASEMENT)210.8(A)(5) UNFINISHED BASEMENT/ RECEPTACLE INSTALLED NOT GFCIPROTECTED. |
RSLV |
03/07/2023 |
03/07/2023 |
06/13/2023 |
| |
| 009 |
(176) |
INSTALLATION DOES NOT MEET CODE REQUIREMENTS (GROUND FLOOR)GND FLR- GFCI INSTALLED OUTSIDE MUST BE WEATHER RESISTANT 406.8(B)NOT PROVIDED/ REAR OF BUILDING |
RSLV |
03/07/2023 |
03/07/2023 |
06/13/2023 |