![]() |
![]() ![]() |
|
NYC Department of Buildings | ||
Electrical Application Details for App #: B401698 |
Premises: 1371 EAST 18 STREET BROOKLYN | BIN: 3181108 Block: 6747 Lot: 68 |
Printable (PDF) version of this Permit | |||||||||||
DOB NOW: Inspections | |||||||||||
Filed: | 1375 E 18 ST | Census Tract: 538 | Health Area: 7310 | |
BASEMENT | Admin Area: B - BROOKLYN | Inspection Area: K | ||
BROOKLYN, NY 11230 | Community Board: 314 | |||
![]() | ![]() | ![]() | ![]() |
DOB Cross Street(s): AVENUE M, AVENUE N | |||
Status: N - NO ACCESS 10/05/2017 | |||
Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 10/01/2015 10:33 PM | |
Application Entered: 10/01/2015 | Job Start Date: 10/01/2015 | ||
Last Change: 10/05/2017 | Job End Date: 11/01/2015 | ||
COMPLETION FEE WAS BILLED |
![]() | ![]() | ![]() | ![]() |
Appointment Status: | |||
Last Inspection By: NAJI PHILLIIPS On 10/05/2017 | |||
Field Disp: N - NO ACCESS | |||
Energize Recommendation: | |||
Objection Disposition: |
License #: | 010715 | Licensee Name: | TIMOTHY M MCDONALD | |
Firm: | 001937 | Firm Name: | MAC ELECT'L CONTR. INC. | |
Firm Phone: | 718-758-3500 | Firm Address: | 2807 FLATBUSH AVENUE BROOKLYN NY 11234 |
Work Started or Filed by Others: NO | ||||||||
Work Category: R - REHABILITATION | Work To Be Done:
8 - BOILER/BURNER WIRING |
Total Fee: $52.00 | ||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: No |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ||
Building Used As: L - Five Or More Family | |||||||
Special Cert Approval: B - BOILER CONTROLS J-51 CERTIFICATION | |||||||
Advisory Board Approval: NOT APPLICABLE | |||||||
Owner / Occup: | MILORAD RAJACIC | ||||||
Owner Business Name: | 1375 E18 LLC | ||||||
Authorized Representative: | |||||||
Relationship To Owner: |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
Buildings Total | ||||||||||||
Total Units : 0 units |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
![]() | ![]() | ![]() | ![]() |
Power Auth Flag: | Objection Flag: | ||
Power Requested: | Notice: | ||
Power Issued: | Response: |
![]() | ![]() | ![]() | ![]() |
Follow-Up: | |||
Contractor's Comments: |
|