| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
1 |
100 AMP |
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
400 AMP |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
9 |
3#2 THHN BX |
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
1 |
4-350MCM |
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
9 |
20CKT |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(129) |
SERVICE SWITCH NEUTRAL NOT BONDED TO ENCLOSURE (BASEMENT) PLP SERVICE SWITCH NEUTRAL NOT BONDED TO PANEL ENCLOSURE |
RSLV |
08/05/2016 |
08/05/2016 |
08/24/2016 |
| |
| 002 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (BASEMENT) GROUND RACEWAY NOT GROUNDED |
RSLV |
08/05/2016 |
08/05/2016 |
08/24/2016 |
| |
| 003 |
( 14) |
CIRCUIT OVERCURRENT PROTECTION DEVICE IS OF IMPROPER SIZE (BASEMENT) 3/0 WIRE FUSED AT 400 AMP SERVICE SWITCH |
RSLV |
08/05/2016 |
08/05/2016 |
09/30/2016 |
| |
| 004 |
(279) |
WATER METER JUMPER IS MISSING/IMPROPER (BASEMENT) NO WATER JUMPER INSTALLED |
RSLV |
08/05/2016 |
08/05/2016 |
08/24/2016 |
| |
| 005 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (BASEMENT) GROUND WIRE UNDER SIZED |
RSLV |
08/05/2016 |
08/05/2016 |
08/24/2016 |
| |
| 006 |
( 59) |
AFCI PROTECTION HAS NOT BEEN PROVIDED (BASEMENT) APARTMENT 2 SMOKE DETECTOR NOT AFCI PROTECTED |
RSLV |
08/05/2016 |
08/05/2016 |
08/24/2016 |
| |
| 007 |
(151) |
AIR COND/REFRIG EQUIPMENT NOT PROPERLY MARKED/SIZED/INSTALLED (ROOF) AC NOT LABLED ON ROOF |
RSLV |
08/05/2016 |
08/05/2016 |
08/24/2016 |
| |
| 008 |
(307) |
NO RECEPTACLE OUTLET WITHIN 25 FEET FOR HVAC EQUIPMENT (ROOF) NO AC OUTLET 25 FEET TO COMPRESSORS ON ROOF |
RSLV |
08/05/2016 |
08/05/2016 |
08/24/2016 |
| |
| 009 |
(999) |
OTHER (BASEMENT)LOW VOLTAGE WIRES IN SERVICE ROOM 110.25 / ADMINISTRATIVE |
RSLV |
08/24/2016 |
08/24/2016 |
09/30/2016 |