| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
72 |
4- #2 RISERS |
| B. Over #2 to 1/0 |
1 |
3- #1/0 FIRE PUMP |
| C. Over 1/0 to 250 MCM |
12 |
4- #3/0 METER BNKS |
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
72 |
12 POSITION |
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (FLOOR: 001)NO EGC'S PROVIDED AT CHANDELIERS AND SCONCES. ART. 410.46 |
OPEN |
06/16/2020 |
06/16/2020 |
|
| |
| 002 |
(101) |
CONDUCTORS AND/OR EQUIPMENT USED IS NOT APPROVED (FLOOR: 004)RM 401 - DEFECTIVE BX TO WATER HEATER AT SINK - SOUTH WALL. AMEND110.2.A |
OPEN |
06/16/2020 |
06/16/2020 |
|
| |
| 003 |
( 16) |
DEFECTIVE LIGHTING FIXTURES ARE IN USE (FLOOR: 004) DEFECTIVE EXIT LIGHT AT HALLWAY. AMEND 110.2.A |
OPEN |
06/16/2020 |
06/16/2020 |
|
| |
| 004 |
(329) |
OPENINGS TO BE SEALED (FLOOR: 004) RM 401 - OPEN KO'S AT 1900 BOX. ART. 110.12.A |
OPEN |
06/16/2020 |
06/16/2020 |
|
| |
| 005 |
( 61) |
INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS (FLOOR: 004) SETBACK AT RECEPS IN SHEETROCK. ART. 314.20 |
OPEN |
06/16/2020 |
06/16/2020 |
|
| |
| 006 |
(128) |
NEUTRAL IS GROUNDED BEYOND LOAD SIDE OF SERVICE SWITCH (FLOOR: 007)RM 711 - EGC TERMINATED AT NEUTRAL IN PANEL. ART. 250.24.A.5 |
OPEN |
06/16/2020 |
06/16/2020 |
|
| |
| 007 |
(211) |
RECEPTACLE IS NOT PROPERLY BONDED/GROUNDED (FLOOR: 007)RM 711 - EGC NOT INSTALLED AT QUAD NEAR DOOR. ART. 250.146 |
OPEN |
06/16/2020 |
06/16/2020 |
|
| |
| 008 |
( 27) |
ARMORED CABLES INSTALLED WITHOUT INSULATING BUSHINGS (FLOOR: 007)RM 711 - NO ANTI-SHORT BUSHING AT BX IN PANEL. ART. 320.40 |
OPEN |
06/16/2020 |
06/16/2020 |
|
| |
| 009 |
(272) |
EQUIPMENT GROUNDING CONDUCTOR NOT PROPERLY INSTALLED (FLOOR: 007)RM 711 - EGC NOT TERMINATED TO BOX AT RECEP AT NORTH WALL. ART.250.118 |
OPEN |
06/16/2020 |
06/16/2020 |
|
| |
| 010 |
( 61) |
INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS (FLOOR: 007) RM 711 - SETBACK AT QUAD NEAR DOOR. ART. 314.20 |
OPEN |
06/16/2020 |
06/16/2020 |
|
| |
| 011 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (ALL FLOORS)EGC'S NOT TERMINATED TO BOXES AT EXIT LIGHTS. ART. 250.118 |
OPEN |
06/16/2020 |
06/16/2020 |
|