![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B391272 | ||
| Premises: 381 STATE STREET BROOKLYN | BIN: 3000568 Block: 172 Lot: 62 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 381 STATE ST | Census Tract: 41 | Health Area: 2400 | |
| BOOND AND NEVINS | Admin Area: B - BROOKLYN | Inspection Area: C | ||
| BROOKLYN, NY 11217 | Community Board: 302 | |||
| Special Place Name: BETWEEN | ||||
| DOB Cross Street(s): BOND STREET, NEVINS STREET | |||
| Status: C - JOB IS SIGNED OFF 01/27/2016 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 01/22/2015 8:15 PM | |
| Application Entered: 01/22/2015 | Job Start Date: 01/26/2015 | ||
| Last Change: 01/27/2016 | Job End Date: 01/26/2016 | ||
| Appointment Status: | |||
| Last Inspection By: ROBINSON HEATH On 11/25/2015 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 011015 | Licensee Name: | ERROL G GLANVILLE | |
| Firm: | 002353 | Firm Name: | THROOP ELECTRIC CO., INC. | |
| Firm Phone: | 718-282-8201 | Firm Address: | 610 ROGERS AVENUE BROOKLYN NY 11225 | |
| Work Started or Filed by Others: YES | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY |
Total Fee: $109.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: B - Two Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | DONALD BROWN | ||||||
| Authorized Representative: DONALD BROWN | |||||||
| Relationship To Owner: OWNER | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 3 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 1 | + New Meters | 3 | - Removed Meters | 1 | = Total Meters | 3 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 01/22/2015 | Notice: | 1 - FIRST NOTICE 11/09/2015 |
| Power Issued: | 01/22/2015 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|