![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B387246 | ||
| Premises: 358 NEPTUNE AVENUE BROOKLYN | BIN: 3244272 Block: 8662 Lot: 97 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 360 NEPTUNE AV | Census Tract: 364 | Health Area: 9110 | |
| 6 FLOORS | Admin Area: B - BROOKLYN | Inspection Area: R | ||
| BROOKLYN, NY 11235 | Community Board: 313 | |||
| Related Job Number: 320785316 | |||
| DOB Cross Street(s): BRIGHTON 3 STREET, BRIGHTON 1 STREET | |||
| Status: C - JOB IS SIGNED OFF 12/27/2016 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 10/12/2014 9:02 AM | |
| Application Entered: 10/12/2014 | Job Start Date: 10/12/2014 | ||
| Last Change: 12/27/2016 | Job End Date: 10/12/2015 | ||
| Appointment Status: | |||
| Last Inspection By: ROBINSON HEATH On 12/27/2016 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 009622 | Licensee Name: | JOHN DIDONATO | |
| Firm: | 000774 | Firm Name: | JOHN MICHAEL ELEC'L CONTG | |
| Firm Phone: | 718-815-8022 | Firm Address: | 85D INDUSTRIAL LOOP CORP STATEN ISLAND NY 10309 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 3 - ELEVATOR/ESCALATOR/MATERIAL LIFT 6 - GENERAL WIRING 7 - HVAC WIRING |
Total Fee: $4,340.50 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: YES | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: O - Office Bldg | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | SERGIE GUBERMAN | ||||||
| Owner Business Name: | NEPTUNE GROUP LLC | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 001 | 67 | 25 | 15 | 67 | ||||||||
| 002 | 76 | 25 | 15 | 76 | ||||||||
| 003 | 101 | 40 | 25 | 101 | ||||||||
| 004 | 102 | 40 | 25 | 102 | ||||||||
| 005 | 81 | 40 | 25 | 81 | ||||||||
| 006 | 59 | 40 | 25 | 59 | ||||||||
| Buildings Total | 486 | 210 | 130 | 486 | ||||||||
| Total Units : 1312 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 18 | #10-Wire | 1 | |
| Existing Meters | 0 | + New Meters | 19 | - Removed Meters | 0 | = Total Meters | 19 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 10/12/2014 | Notice: | 1 - FIRST NOTICE 12/22/2016 |
| Power Issued: | 10/12/2014 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|