BIS Menu  |  ECB Query for LL 158/17 Pro Cert Restriction  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B377701
Premises: 646 MYRTLE AVENUE BROOKLYN BIN: 3054941     Block: 1912   Lot: 33
   
Application Completed and Certified

Filed: 646 MYRTLE AV Census Tract:   235 Health Area:  1410
STREET Admin Area:   B - BROOKLYN Inspection Area:   D
BROOKLYN, NY 11205 Community Board:   303
Special Place Name:   SIDEWALK
DOB Cross Street(s):   KENT AVENUE,    FRANKLIN AVENUE
Status:   C - JOB IS SIGNED OFF 05/12/2015
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  02/18/2014 10:57 AM
Application Entered:   02/18/2014 Job Start Date:   02/18/2014
Last Change:   05/12/2015 Job End Date:   02/18/2016
Appointment Status:   
Last Inspection By:   THOMAS, PATRICIA       On     05/08/2015      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011681 Licensee Name: PAUL OLSEN
Firm: 004266 Firm Name: NASH ELECTRIC SERVICES IN
Firm Phone: 646-688-3350  Firm Address: 286 EAST 236TH STREET BRONX NY 10470 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
W - SIDEWALK SHED WIRING & LIGHTING
Total Fee:  $40.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   SHED LIGHTING
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: VJOLCA PILKU
Owner Business Name: PILKU CONST SERVICES
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
SWK                   
Buildings Total                   
Total Units : 4 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  SIDEWALK SHED LIGHTING FOR PILKU CONST SERVICES ONLY

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B377701
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/08/2015 05/11/2015 PAT C (1) (0) Y
INSPECTION COMMENTS: INSTALLED & REMOVED




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  ECB Query for LL 158/17 Pro Cert Restriction  |  Electrical Inspection Work Order  |  Back