BIS Menu  |  DOB Violations  |  Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B374192
Premises: 291 UNION STREET BROOKLYN BIN: 3398702     Block: 339   Lot: 7503
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 291 UNION ST Census Tract:   67 Health Area:  4000
GROUND FLOOR Admin Area:   B - BROOKLYN Inspection Area:   C
BROOKLYN, NY 11231 Community Board:   306
Special Place Name:   MAIMONIDES MEDICAL CENTER
DOB Cross Street(s):   CLINTON STREET,    COURT STREET
Status:   C - JOB IS SIGNED OFF 05/03/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  10/31/2013 10:10 AM
Application Entered:   10/31/2013 Job Start Date:   10/31/2013
Last Change:   05/03/2017 Job End Date:   10/31/2014
Appointment Status:   
Last Inspection By:   CAMPBELL, C       On     05/02/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010863 Licensee Name: JOHN M DELUCA
Firm: 002448 Firm Name: DELCO ELECTRICAL CORP.
Firm Phone: 212-221-0068  Firm Address: 4233 ARTHUR KILL ROAD, STE 2A STATEN ISLAND NY 10309 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $137.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   I - Hospital Or Health Facility
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: 340 COURT STREET LLC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND    60  110    42  188             
Buildings Total 60  110    42  188                
Total Units : 400 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B374192
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/02/2017 05/03/2017 CLC C (80) (0) Y
INSPECTION COMMENTS: INSPECTION PASS




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  DOB Violations  |  Applications  |  Electrical Inspection Work Order  |  Back