BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B368284
Premises: 1245 AVENUE X BROOKLYN BIN: 3201757     Block: 7397   Lot: 34
   
Application Completed and Certified

Filed: 1245 AV X Census Tract:   584 Health Area:  8721
ELEVATOR ROOMS Admin Area:   B - BROOKLYN Inspection Area:   P
BROOKLYN, NY 11235 Community Board:   315
DOB Cross Street(s):   SHEEPSHEAD BAY ROAD,    EAST 13 STREET
Status:   C - JOB IS SIGNED OFF 01/24/2014
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  05/30/2013 6:59 PM
Application Entered:   05/30/2013 Job Start Date:   05/31/2013
Last Change:   01/24/2014 Job End Date:   06/15/2013
Appointment Status:   
Last Inspection By:   JOHN, CHARLES       On     07/31/2013      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010831 Licensee Name: MICHAEL F ADANUNCIO
Firm: 002433 Firm Name: MICHAEL F. ADANUNCIO ELEC
Firm Phone: 718-851-8222  Firm Address: 559 MAPLE STREET BROOKLYN NY 11203 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $42.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: EVELYN WASSERMAN
Owner Business Name: WASSERMAN REALTY
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
EPT                 
ROF                 
Buildings Total                 
Total Units : 18 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALLING LIGHTING, GFCI RECEPTACLE/SWITCH OUTLETS IN ELEVATOR RM. & ELEVATOR PIT.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B368284
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/26/2013 07/29/2013 CJE N (15) (0) Y
INSPECTION COMMENTS: CONTRACTOR NO SHOW
 
(2) 07/31/2013 08/05/2013 CJH C (25) (0) Y
INSPECTION COMMENTS: N