BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
Building Overview Work Items |
QUANTITY |
DESCRIPTION |
SERVICE SWITCHES |
|
A. Up to 100 AMPS |
0 |
|
B. 101 Up to 200 AMPS |
0 |
|
C. 201 Up to 600 AMPS |
1 |
|
D. 601 Up to 1200 AMPS |
0 |
|
E. Over 1200 AMPS |
0 |
|
SER. ENT. & FDR COND (EACH SET) |
|
A. Up to #2 CONDUCTOR |
16 |
|
B. Over #2 to 1/0 |
0 |
|
C. Over 1/0 to 250 MCM |
0 |
|
D. Over 250 MCM |
0 |
|
PANELS |
|
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
17 |
|
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
C. 3 Phase Up to 225 AMPS |
0 |
|
D. 3 Phase Over 225 AMPS |
0 |
|
ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
B. Each Additional 10 Floors Or Less |
0 |
|
BOILER CONTROLS |
0 |
|
OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
|
001 |
(211) |
RECEPTACLE IS NOT PROPERLY BONDED/GROUNDED ALL FLOORS |
RSLV |
10/20/2014 |
10/20/2014 |
12/15/2014 |
|
002 |
(128) |
NEUTRAL IS GROUNDED BEYOND LOAD SIDE OF SERVICE SWITCH 2D PANEL |
RSLV |
10/20/2014 |
10/20/2014 |
12/15/2014 |
|
003 |
( 34) |
KNOCKOUTS ARE NOT CLOSED IN PANEL BOX 2D PANEL |
RSLV |
10/20/2014 |
10/20/2014 |
12/15/2014 |
|
004 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY ALL FLOORS |
RSLV |
10/20/2014 |
10/20/2014 |
12/15/2014 |
|
005 |
(282) |
MINIMUM NUMBER OF SMALL APPLIANCE CIRCUITS ALL FLOORS KIT |
RSLV |
10/20/2014 |
10/20/2014 |
12/15/2014 |
|
006 |
(283) |
SMALL APPLIANCE OUTLETS NOT PROPERLY LOCATED ALL FLOORS KIT |
RSLV |
10/20/2014 |
10/20/2014 |
12/15/2014 |
|
007 |
(282) |
MINIMUM NUMBER OF SMALL APPLIANCE CIRCUITS APT 1-C KIT COUNTER (210.52)(B)(1) |
RSLV |
12/15/2014 |
12/15/2014 |
01/22/2015 |
|
008 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY APT 1-C HALLWAY PANEL (408.4) |
RSLV |
12/15/2014 |
12/15/2014 |
01/22/2015 |