| Electrical Application Details for App #: B359205 | ||
| Premises: 1 NEWPORT STREET BROOKLYN | BIN: 3082176 Block: 3595 Lot: 5 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 9 NEWPORT ST | Census Tract: 894 | Health Area: 5820 | |
| GROUND FLOOR | Admin Area: B - BROOKLYN | Inspection Area: H | ||
| BROOKLYN, NY 11212 | Community Board: 316 | |||
| DOB Cross Street(s): EAST 98 STREET, SARATOGA AVENUE | |||
| Status: C - JOB IS SIGNED OFF 10/03/2024 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 01/16/2013 7:12 PM | |
| Application Entered: 01/16/2013 | Job Start Date: 01/16/2013 | ||
| Last Change: 10/03/2024 | Job End Date: 01/15/2014 | ||
| Appointment Status: | |||
| Last Inspection By: DALTON HENLON On 10/03/2024 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011953 | Licensee Name: | IRVING BAPTISTE | |
| Firm: | 003611 | Firm Name: | RPJ ELECTRIC CORP | |
| Firm Phone: | 718-241-0277 | Firm Address: | 3421 CHURCH AVENUE BROOKLYN NY 11203 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
W - SIDEWALK SHED WIRING & LIGHTING |
Total Fee: $40.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | KULWINDER SINGH | ||||||
| Owner Business Name: | G N CONSTRUCTION INC | ||||||
| Authorized Representative: IRVING BAPTISTE | |||||||
| Relationship To Owner: SUB-CONTRACTOR | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| GND | 1 | 9 | ||||||||||
| Buildings Total | 1 | 9 | ||||||||||
| Total Units : 10 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: INSTALLATION OF LIGHTING FOR SIDEWALK SHED | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 10/03/2024 | 10/03/2024 | DAH | C | (15) | (0) | Y | |||
| INSPECTION COMMENTS: | THE SHED IS REMOVED. | |||||||||