BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B358821
Premises: 440 ST JOHNS PLACE BROOKLYN BIN: 3029526     Block: 1176   Lot: 40
   
Application Completed and Certified

Filed: 440 ST JOHNS PL Census Tract:   215 Health Area:  2720
BASEMENT Admin Area:   B - BROOKLYN Inspection Area:   D
BROOKLYN, NY 11238 Community Board:   308
DOB Cross Street(s):   UNDERHILL AVENUE,    WASHINGTON AVENUE
Status:   C - JOB IS SIGNED OFF 04/08/2013
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  01/09/2013 2:32 PM
Application Entered:   01/09/2013 Job Start Date:   01/09/2013
Last Change:   04/08/2013 Job End Date:   09/30/2013
Appointment Status:   
Last Inspection By:   JEFFERSON, CHARLES       On     04/02/2013      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011307 Licensee Name: WILLIAM M SWANE
Firm: 002715 Firm Name: WILLIAMS ELECTRIC CORP.
Firm Phone: 718-834-8087  Firm Address: 50-13 5TH STREET LONG ISLAND CITY NY 11101 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $52.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: 440 ST JOHNS PLACE LLC
Authorized Representative:  TOM DIFAZIO
Relationship To Owner:   CONTRACTOR


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  # 12 WIRE

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS                     
Buildings Total                     
Total Units : 2 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B358821
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 04/02/2013 04/08/2013 CJE C (10) (0) Y
INSPECTION COMMENTS: N




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back