![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B356232 | ||
| Premises: 6714 5 AVENUE BROOKLYN | BIN: 3144514 Block: 5851 Lot: 46 |
| Application Completed and Certified | ||
| Filed: | 6714 5 AV | Census Tract: 126 | Health Area: 7700 | |
| OUTSIDE AND INSIDE | Admin Area: B - BROOKLYN | Inspection Area: J | ||
| BROOKLYN, NY 11220 | Community Board: 310 | |||
| DOB Cross Street(s): 67 STREET, SENATOR STREET | |||
| Status: C - JOB IS SIGNED OFF 04/15/2014 | |||
| Request Type: P - PICK-UP | eFiled: YES | ||
| Application Entered: 07/15/2013 | Job Start Date: 07/15/2013 | ||
| Last Change: 04/15/2014 | Job End Date: 07/17/2013 | ||
| Appointment Status: | Complaint Number: 3363797 | ||
| Last Inspection By: TREJO, JORGE On 02/07/2014 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 011997 | Licensee Name: | CRAIG E SAMUELS | |
| Firm: | 003645 | Firm Name: | AMPERE ELECTRIC CORP | |
| Firm Phone: | 718-527-9324 | Firm Address: | 200-06 LINDEN BLVD ST. ALBANS NY 11412 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $44.50 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: C - Three Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | JING CHENG | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 001 | 13 | 4 | 2 | |||||||||
| Buildings Total | 13 | 4 | 2 | |||||||||
| Total Units : 19 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 02/18/2014 | Notice: | 11/14/2012 |
| Power Issued: | 02/18/2014 | Response: | F - FILED TO REMOVE OBJECTION 07/15/2013 |
| Follow-Up: | X - FILED APPL,NOW CLOSED 07/15/2013 | ||
| Contractor's Comments: MAKE CORRECTION TO REMOVE VIOLATION | |||
|
|