| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
1 |
PNL A 1ST FL |
| B. 101 Up to 200 AMPS |
1 |
HOUSE PNL |
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
1 |
PNL A |
| B. Over #2 to 1/0 |
1 |
HOUSE PNL |
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
1 |
SUB HOUSE PNL |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
2 |
PNL A, HOUSE PNL |
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 52) |
TEMPORARY OPEN WIRING FEEDS OTHER FLOORS DOUBLE SINK ON 3.4 FL NEED TWO GFCI |
RSLV |
07/25/2014 |
07/25/2014 |
08/07/2014 |
| |
| 002 |
( 19) |
DEFECTIVE WIRING IS IN USE OUTLET OVER STOVE MOVE TO C.T |
RSLV |
07/25/2014 |
07/25/2014 |
08/07/2014 |
| |
| 003 |
(999) |
OTHER LIGHT OVER TUB NOT DAMPER PROOF 410.24 |
RSLV |
07/25/2014 |
07/25/2014 |
08/07/2014 |
| |
| 004 |
(999) |
OTHER CIR GROUP IN PANELS THROUGHOUT 300.20 |
RSLV |
07/25/2014 |
07/25/2014 |
08/07/2014 |
| |
| 005 |
( 53) |
GFCI HAS NOT BEEN PROVIDED NO GFCI MECH RM |
RSLV |
07/25/2014 |
07/25/2014 |
08/07/2014 |
| |
| 006 |
(311) |
FIXTURE NOT APPROVED FOR DAMP/WET LOCATION BATHROOM FIXTURE THROUGHOUT SUITABLE FOR DRY LOCATION ONLY 410.10A |
RSLV |
08/07/2014 |
08/07/2014 |
08/26/2014 |
| |
| 007 |
(311) |
FIXTURE NOT APPROVED FOR DAMP/WET LOCATION BATHROOM FIXTURE OVERTUB NOT DAMPER - PROOF |
RSLV |
08/07/2014 |
08/07/2014 |
08/26/2014 |