| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
5 |
2 SETS 350 MCM |
| D. 601 Up to 1200 AMPS |
1 |
2 SETS 500 MCM |
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
107 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
8 |
|
| D. Over 250 MCM |
1 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
107 |
3 PNL |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
8 |
|
| D. 3 Phase Over 225 AMPS |
1 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER BASE NOT AS PER A/B DRAWING, HOUSE DISTRIBUTION PNL THERE IS NO 400AMP SW |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 002 |
(999) |
OTHER BASE, UNDERSIZED EQUIPMENT GROUNDS, COMMUNITY ROOM FEEDERS |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 003 |
(129) |
SERVICE SWITCH NEUTRAL NOT BONDED TO ENCLOSURE COMMUNITY SPACE 400 AMPS SER/SW |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 004 |
(129) |
SERVICE SWITCH NEUTRAL NOT BONDED TO ENCLOSURE UNDERSIZED BOND SER/ENTRANCE RACEWAY |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 005 |
(255) |
NO FUSE COORDINATION EXISTS ALL METER BANK CIRCUIT BREAKER NOT 65K 410.130 |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 006 |
(999) |
OTHER PANIC BAR NOT PROVIDED IN SER/ROOM 110.26C |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 007 |
(220) |
DOUBLE LUGGING IN SERVICE SWITCH DISTRIBUTION PNL TWO #6AWG WIRE UNDER A LUG |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 008 |
( 59) |
AFCI PROTECTION HAS NOT BEEN PROVIDED NO COMBINATION AFCI PROVIDED |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 009 |
( 53) |
GFCI HAS NOT BEEN PROVIDED KIT PENINSULAR REC NOT GFCI |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 010 |
( 42) |
BUSHINGS ARE MISSING OR LOOSE COMMUNITY ROOM ALL PNLS |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 011 |
(999) |
OTHER MULTI-WIRE BRANCH CIRCUIT HANDLE TIE NOT PROVIDED 210.4D |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 012 |
(999) |
OTHER COMMUNICATION GROUND BAR NOT PROVIDED 250.94 |
RSLV |
12/18/2013 |
12/18/2013 |
01/14/2014 |
| |
| 013 |
( 59) |
AFCI PROTECTION HAS NOT BEEN PROVIDED BLDGE SMOKE DETECTOR |
RSLV |
01/14/2014 |
01/14/2014 |
02/19/2014 |
| |
| 014 |
( 59) |
AFCI PROTECTION HAS NOT BEEN PROVIDED BLDGE LIGHTS |
RSLV |
01/14/2014 |
01/14/2014 |
02/19/2014 |
| |
| 015 |
(255) |
NO FUSE COORDINATION EXISTS METER BANK CIRCUIT BREAKERS NOT 65K |
RSLV |
01/14/2014 |
02/19/2014 |
04/23/2014 |