| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
3 |
100A |
| B. 101 Up to 200 AMPS |
1 |
200A |
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
3 |
1-800, 2-1200 |
| E. Over 1200 AMPS |
7 |
3-1600,4-4000 |
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
251 |
109-#4,49-#3,93-#2 |
| B. Over #2 to 1/0 |
108 |
60-#1, 48-1/0 |
| C. Over 1/0 to 250 MCM |
38 |
18-2/0,20-3/0 |
| D. Over 250 MCM |
106 |
39-500, 67-600 |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
351 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
19 |
5-100, 14-200 |
| D. 3 Phase Over 225 AMPS |
17 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(127) |
NO GROUND HAS BEEN PROVIDED FOR SEPARATELY DERIVED SYSTEM (FLOOR: 005)250.30,50,52 ROOF: GEN. 277/480 V NOT PROPERLY GND/BONDED ( MAINSERVICE 120/208 V) |
OPEN |
10/18/2021 |
10/18/2021 |
|
| |
| 002 |
( 6) |
FEEDER DIAGRAM DID NOT ACCOMPANY APPLICATION FOR INSPECTION (ALL FLOORS) 215.5 NO FEEDER DIAGRAM FOR EMERGENCY POWER |
OPEN |
10/18/2021 |
10/18/2021 |
|
| |
| 003 |
(109) |
SUFFICIENT WORK SPACE IS NOT PROVIDED/MAINTAINED (CELLAR) 110.26 NO WORKING SPACE ON TOP OF S. SW. |
OPEN |
10/18/2021 |
10/18/2021 |
|
| |
| 004 |
(124) |
TAP CONDUCTORS ARE NOT WITHIN 10 FT OR WITHIN 25 FT AS PER CODE (CELLAR) 240.21, 695.1 UNDERSIZED TAP CONDUCTORS FOR JOCKEY PUMP |
OPEN |
10/18/2021 |
10/18/2021 |
|
| |
| 005 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED (CELLAR) 250.30 1500 KVA T-FMR NOT PROPERLY GND/BONDED |
OPEN |
10/18/2021 |
10/18/2021 |
|
| |
| 006 |
(221) |
NOT INSTALLED PER ADVISORY BOARD DRAWING (CELLAR)AM. 110.2 , AM. 408.60(A) INSTALLATION NOT PER CONTRACTORSDRAWING |
OPEN |
10/18/2021 |
10/18/2021 |
|
| |
| 007 |
(255) |
NO FUSE COORDINATION EXISTS (CELLAR)240.12 NO FUSE COORDINATION BETWEEN 1ST AND 2ND LEVEL |
OPEN |
10/18/2021 |
10/18/2021 |
|
| |
| 008 |
( 4) |
SERVICE IN EXCESS OF 1000KVA HAS NOT BEEN SUBMITTED FOR APPROVAL (CELLAR)AM. 110.2 NO APPROVED DRAWING FOR OVER 1000 KVA ELECTRICSERVICE ROOM |
OPEN |
10/18/2021 |
10/18/2021 |
|
| |
| 009 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (CELLAR) 250.50,52 NO ACCESS TO GND ROD CONNECTION |
OPEN |
10/18/2021 |
10/18/2021 |
|
| |
| 010 |
(999) |
OTHER (CELLAR)ADMINISTRATIVE PAA REQUIRED FOR QUANTITY OF S. SW(S) (TOTAL 16) |
OPEN |
10/18/2021 |
10/18/2021 |
|