| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
1 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 34) |
KNOCKOUTS ARE NOT CLOSED IN PANEL BOX DISCONNECT SWITCH |
RSLV |
05/23/2012 |
05/23/2012 |
10/17/2012 |
| |
| 002 |
( 18) |
DEFECTIVE RECEPTACLES ARE IN USE (ALL FLOORS) BY ELEVATOR CONTROLLER PANEL GFCI OUTLET |
RSLV |
05/23/2012 |
10/17/2012 |
07/19/2016 |
| |
| 003 |
( 19) |
DEFECTIVE WIRING IS IN USE (ALL FLOORS) BY ELEVATOR CONTROLLER PANEL GFCI OUTLETS |
RSLV |
05/23/2012 |
10/17/2012 |
07/19/2016 |
| |
| 004 |
(181) |
DISCONNECTING MEANS IS IMPROPER/NOT PROVIDED (ALL FLOORS) FOR CAB LIGHT |
RSLV |
05/23/2012 |
10/17/2012 |
07/19/2016 |
| |
| 005 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY (ALL FLOORS) 100A SWITCH NOT LABEL FOR NEW ELEVATOR SWITCH |
RSLV |
05/23/2012 |
10/17/2012 |
07/19/2016 |
| |
| 006 |
( 7) |
EMT IS NOT PROPERLY SUPPORTED (TYPE:EMT) (ROOF) BETWEEN 100AMP MAIN & CONTROLLER |
RSLV |
07/19/2016 |
07/19/2016 |
10/20/2016 |
| |
| 007 |
(999) |
OTHER (ROOF) FEEDER TO CONTROLLER NOT SIZED AS PER 620.13(B) |
RSLV |
07/19/2016 |
07/19/2016 |