BIS Menu  |  Plumb. Inspections  |  DOB Violations  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B338054
Premises: 15 PIERREPONT STREET BROOKLYN BIN: 3001732     Block: 234   Lot: 5
   
Application Completed and Certified

Filed: 15 PIERREPONT ST Census Tract:   3.01 Health Area:  2300
BASEMENT/ Admin Area:   B - BROOKLYN Inspection Area:   C
BROOKLYN, NY 11201 Community Board:   302
DOB Cross Street(s):   PIERREPONT PLACE,    WILLOW STREET
Status:   C - JOB IS SIGNED OFF 05/07/2012
Request Type:   P - PICK-UP eFiled:   YES
Application Entered:   12/20/2011 Job Start Date:   12/27/2011
Last Change:   05/07/2012 Job End Date:   12/29/2011
Appointment Status:   
Last Inspection By:   ROBINSON HEATH       On     04/30/2012      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  R - REMOVED

License #: 010874 Licensee Name: ALFONSO GIGANTE
Firm: 002154 Firm Name: A.C.G. ELECT. CO., INC.
Firm Phone: 718-714-7292  Firm Address: 153 MAIN STREET STATEN ISLAND NY 10307 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $48.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Commercial/Residential (1  Stores, 4 Apartments)
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: MARC AGGER
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  1  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 05/07/2012 Notice:  04/25/2011
Power Issued: 05/07/2012 Response: F - FILED TO REMOVE OBJECTION 12/20/2011

Follow-Up: X - FILED APPL,NOW CLOSED 12/20/2011
Contractor's Comments:  INSTALL SERVICE GROUNDING CONDUCTOR

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B338054
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 04/21/2011 04/25/2011 DEX W (20) (1)
INSPECTION COMMENTS: N
 
(2) 04/30/2012 05/07/2012 HRB C R E (30) (0) Y
INSPECTION COMMENTS: N

OBJECTION FOR APPLICATION #: B338054
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 ( 5) SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY
NO GROUND FOR ELECTRICAL SYSTEM
RSLV 04/21/2011 04/21/2011 04/30/2012



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Plumb. Inspections  |  DOB Violations  |  Electrical Inspection Work Order  |  Back