![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B335468 | ||
| Premises: 312 BEDFORD AVENUE BROOKLYN | BIN: 3062940 Block: 2405 Lot: 23 |
| Printable (PDF) version of this Permit | |||||||||||
| DOB NOW: Inspections | |||||||||||
| Filed: | 312 BEDFORD AV | Census Tract: 5510 | Health Area: 0400 | |
| BASEMENT, 1-3 | Admin Area: B - BROOKLYN | Inspection Area: A | ||
| BROOKLYN, NY 11211 | Community Board: 301 | |||
| DOB Cross Street(s): SOUTH 1 STREET, SOUTH 2 STREET | |||
| Status: E - ABANDONED 08/22/2025 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 01/27/2011 1:18 PM | |
| Application Entered: 01/27/2011 | Job Start Date: 01/27/2011 | ||
| Last Change: 08/22/2025 | Job End Date: 01/27/2012 | ||
| Appointment Status: | |||
| Last Inspection By: PETER GREENE On 08/10/2011 | |||
| Field Disp: V - OBJCTN ISSD: JOB INCOMPLT | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: | |||
| License #: | 011485 | Licensee Name: | BENJAMIN DREBIN | |
| Firm: | 002950 | Firm Name: | ACCURATE ELEC'L CORP. | |
| Firm Phone: | 718-606-9181 | Firm Address: | 11-07 43RD ROAD LONG ISLAND CITY NY 11101 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $321.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | DAVID TABAK | ||||||
| Owner Business Name: | 543 BEDFORD AVE INC | ||||||
| Authorized Representative: DAVID TABAK | |||||||
| Relationship To Owner: EC | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 001 | 30 | 10 | 15 | 1 | 3 | |||||||
| 002 | 30 | 10 | 15 | 1 | 3 | |||||||
| 003 | 30 | 10 | 15 | 1 | 3 | |||||||
| Buildings Total | 90 | 30 | 45 | 9 | ||||||||
| Total Units : 174 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 4 | #4-Wire | 1 | #10-Wire | 0 | |
| Existing Meters | 5 | + New Meters | 5 | - Removed Meters | 5 | = Total Meters | 5 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | V - OBJECTION(S) EXIST |
| Power Requested: | 01/27/2011 | Notice: | 1 - FIRST NOTICE 08/15/2011 |
| Power Issued: | 01/27/2011 | Response: |
| Follow-Up: | |||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 08/10/2011 | 08/15/2011 | PGR | V | E | (60) | (4) | Y | ||
| INSPECTION COMMENTS: | N/A TO APT 3 AND ROOF | |||||||||