BIS Menu  |  Plumb. Inspections  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B334003
Premises: 85 PILLING STREET BROOKLYN BIN: 3080267     Block: 3451   Lot: 50
   
Application Completed and Certified

Filed: 85 PILLING ST Census Tract:   4030 Health Area:  3500
BASTMENT 1 AND 2 FLOOR Admin Area:   B - BROOKLYN Inspection Area:   E
BROOKLYN, NY 11207 Community Board:   304
DOB Cross Street(s):   BUSHWICK AVENUE,    EVERGREEN AVENUE
Status:   C - JOB IS SIGNED OFF 09/12/2011
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  11/30/2010 7:20 PM
Application Entered:   11/30/2010 Job Start Date:   11/30/2010
Last Change:   09/12/2011 Job End Date:   11/30/2011
Appointment Status:   
Last Inspection By:   DOYLEY, DEXTER       On     08/23/2011      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 010939 Licensee Name: MICHAEL L ALPHONSE
Firm: 002249 Firm Name: BESTCO GENERAL ELEC. MAIN
Firm Phone: 718-324-5582  Firm Address: 922 EAST 233RD STREET BRONX NY 10466 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $197.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: SOFI MEGIRA
Authorized Representative:  SOFI MEGRIA
Relationship To Owner:   OWNER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  3  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  5  3#2
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  2  60AMP.16 CKT.1-PHASE
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
MZ1    40  40  12  30           
Buildings Total 40  40  12  30                
Total Units : 124 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 3 #4-Wire 0 #10-Wire 0
Existing Meters 3 + New Meters 4 - Removed Meters 3 = Total Meters 4

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 11/30/2010 Notice:  
Power Issued: 11/30/2010 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALL 3 100AMP.3 WIRE METER 3 60AMP.208 VOLT 16 CKT. PANEL

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B334003
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 08/23/2011 08/30/2011 DEX C E (40) (0) Y