![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B323937 | ||
| Premises: 126 GREENPOINT AVENUE BROOKLYN | BIN: 3064827 Block: 2563 Lot: 26 |
| Application Completed and Certified | ||
| Filed: | 126 GREENPOINT AV | Census Tract: 565 | Health Area: 0100 | |
| ROOF/ BASEMENT | Admin Area: B - BROOKLYN | Inspection Area: A | ||
| BROOKLYN, NY 11222 | Community Board: 301 | |||
| DOB Cross Street(s): FRANKLIN STREET, MANHATTAN AVENUE | |||
| Status: C - JOB IS SIGNED OFF 11/03/2011 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 01/26/2010 9:39 AM | |
| Application Entered: 01/26/2010 | Job Start Date: 05/01/2010 | ||
| Last Change: 11/03/2011 | Job End Date: 10/30/2010 | ||
| Appointment Status: | |||
| Last Inspection By: HUGH MCKESSEY On 11/02/2011 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 011497 | Licensee Name: | ARIE BAR | |
| Firm: | 002968 | Firm Name: | AARCO ELECTRIC, INC | |
| Firm Phone: | 718-531-1114 | Firm Address: | 5902 AVENUE N BROOKLYN NY 11234 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING 9 - OTHER S - SUSTAINABLE ENERGY - GENERAL |
Total Fee: $100.50 | ||||||
| Other Work: SOLAR SYSTEM | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: I - Hospital Or Health Facility | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | GREENPOINT AVE EQUITIES L | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| ROF | 20 | 20 | ||||||||||
| Buildings Total | 20 | |||||||||||
| Total Units : 20 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 11/03/2011 | Notice: | 1 - FIRST NOTICE 10/11/2011 |
| Power Issued: | 11/03/2011 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: NEW 20KW SOLAR SYSTEM | |||
|
|