![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B323697 | ||
| Premises: 902 DREW STREET BROOKLYN | BIN: 3323062 Block: 4515 Lot: 1 |
| Printable (PDF) version of this Permit | |||||||||||
| DOB NOW: Inspections | |||||||||||
| Filed: | 902 DREW ST | Census Tract: 1220 | Health Area: 6410 | |
| GROUND FLOOR | Admin Area: B - BROOKLYN | Inspection Area: U | ||
| BROOKLYN, NY 11208 | Community Board: 305 | |||
| DOB Cross Street(s): LORING AVENUE | |||
| Status: E - ABANDONED 08/22/2025 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 01/17/2010 12:03 PM | |
| Application Entered: 01/17/2010 | Job Start Date: 01/17/2010 | ||
| Last Change: 08/22/2025 | Job End Date: 02/17/2010 | ||
| Appointment Status: | |||
| Last Inspection By: THOMAS, PATRICIA On 05/29/2012 | |||
| Field Disp: N - NO ACCESS | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 011623 | Licensee Name: | GEORGE W FEDERLIN | |
| Firm: | 003159 | Firm Name: | REDLINE ELECTRIC INC | |
| Firm Phone: | 718-336-2150 | Firm Address: | 1208 NEPTUNE AVENUE BROOKLYN NY 11224 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING 8 - BOILER/BURNER WIRING |
Total Fee: $520.75 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | GABRIEL TRONCOSO | ||||||
| Owner Business Name: | SPRING CREEK GARDENS | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| GND | 10 | 53 | ||||||||||
| Buildings Total | 53 | |||||||||||
| Total Units : 53 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | V - OBJECTION(S) EXIST | |
| Power Requested: | Notice: | 1 - FIRST NOTICE 11/04/2010 | |
| Power Issued: | Response: |
| Follow-Up: | |||
| Contractor's Comments: NEW BOILER BRANCH CIRCUITS AND ASSOCIATED WIRING. | |||
|
|