| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
2 |
2 - 100 AMPS |
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
1 |
3 #3 |
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(123) |
SERVICE DISCONNECTS ARE NOT PROPERLY GROUPED/LABELED (BASEMENT) SS'S NOT IDENTIFIED. ART. 230.70.B |
OPEN |
04/22/2025 |
04/22/2025 |
|
| |
| 002 |
(126) |
BASEMENT WATER MAIN GROUND NOT INSTALLED ON WATER MAIN (BASEMENT)WATER MAIN NOT BONDED/WATER MAIN GEC NOT PROVIDED. ART. 250.50 |
OPEN |
04/22/2025 |
04/22/2025 |
|
| |
| 003 |
( 19) |
DEFECTIVE WIRING IS IN USE (BASEMENT) OPEN WIRING FOR DOORBELL EQUIPMENT ABOVE MSP. ART. 110.7 |
OPEN |
04/22/2025 |
04/22/2025 |
|
| |
| 004 |
(192) |
CONDUCTORS ARE OVER FUSED AS PER TABLE 310.16 (BASEMENT) OLD CLOTH WIRES OVERFUSED IN MSP'S. ART. 310.16 |
OPEN |
04/22/2025 |
04/22/2025 |
|
| |
| 005 |
(235) |
MAIN BREAKER NOT BOLTED IN (BASEMENT) MAIN BREAKERS IN MSP'S NOT SECURED. ART. 408.36.F |
OPEN |
04/22/2025 |
04/22/2025 |
|
| |
| 006 |
(247) |
SIMULTANEOUS OPENING OF POLES (BASEMENT) MISSING HANDLE TIES ON MULTIWIRES. ART. 210.4 |
OPEN |
04/22/2025 |
04/22/2025 |
|
| |
| 007 |
(308) |
CONDUCTORS ARE NOT PROPERLY INSTALLED/TERMINATED (BASEMENT) CONDUCTORS DOUBLE LUGGED ON MIGB IN MSP. ART. 110.14 |
OPEN |
04/22/2025 |
04/22/2025 |
|
| |
| 008 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (BASEMENT)RIGHT SIDE MSP NEUTRAL NOT GROUNDED/GEC NOT PROVIDED. ART. 250.24 |
OPEN |
04/22/2025 |
04/22/2025 |
|
| |
| 009 |
( 61) |
INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS (BASEMENT) INTERSYSTEM BONDING NOT PROVIDED. ART. 250.94 |
OPEN |
04/22/2025 |
04/22/2025 |
|