Electrical Application Details for App #: B317854
Premises: 38 PROSPECT PARK WEST BROOKLYN BIN: 3025138     Block: 1075   Lot: 35
   
Application Completed and Certified

Filed: 40 PROSPECT PARK W Census Tract:   165 Health Area:  4500
PROSPECT PARK WEST Admin Area:   B - BROOKLYN Inspection Area:   D
BROOKLYN, NY 11215 Community Board:   306
DOB Cross Street(s):   GARFIELD PLACE,    1 STREET
Status:   C - JOB IS SIGNED OFF 02/17/2010
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/28/2009 9:57 AM
Application Entered:   06/28/2009 Job Start Date:   10/13/2009
Last Change:   02/17/2010 Job End Date:   11/09/2009
Appointment Status:   
Last Inspection By:   DOYLEY, DEXTER       On     02/10/2010      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011986 Licensee Name: ANTHONY LUCIANO
Firm: 003652 Firm Name: JAM ELECTRICAL CORP
Firm Phone: 212-265-0142  Firm Address: 1133 6TH AVE 28TH FLOOR NEW YORK NY 10036 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT
Total Fee:  $165.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:   L - FIRE ALARM LOCAL LAW #5
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: NICOLAS BARATTO
Owner Business Name: 40 PROSPECT PARK W OWNERS
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  1  125.00
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  GEN-2 - REHAB DEVICE #3P3386

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B317854
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 02/10/2010 02/17/2010 DEX C (40) (0) Y
INSPECTION COMMENTS: -